Sl.No Name of the Project / Location Services Offered Type of Systems Project Status
1 Recall at Chennai (Ware house) Preparation of Fire Protection system Design, drawings and calculation. Fire Hydrant system, Sprinkler system Completed
2 Recall at Bombay - Kalyan (Ware house) Preparation of Fire Protection system Design, drawings and calculation. Fire Pump Room, Fire Hydrant system & Sprinkler system Completed
3 OPG Power Generation Pvt. Ltd at Gummidipoondi Preparation of High Velocity Water Spray system Design, drawings and calculation. HVWS system for Transformer Completed
4 Apollo Tyres at chennai Preparation of High Velocity Water Spray system Design, drawings and calculation. HVWS system for Transformer Completed
5 American Power Conversion (India) Pvt.ltd at Bangalore, IDF-1&2, IDF4 & 5, IDF-8 (Schenider Electricals) Preparation of Fire Protection system Design, drawings and calculation Fire Hydrant system, , Fire Detection & Alarm system Completed
6 Samsung India at Irrugattukottai Preparation of Fire Protection system Design, drawings and calculation CO2 flooding System for LT & HT Panel Completed
7 Asian Paints at Hyderabad Preparation of Fire Protection system Design, drawings and calculation Hydrant System Completed
8 American Power Conversion (India) Pvt.ltd at Bangalore, IDF-2, (Schenider Electricals) Preparation of Fire Protection system Design, drawings and calculation Wet & Pre Action Sprinkler system Completed
9 IOCL - PARADIP Refinery project, Paradip, Orissa, India Preparation of Fire Protection system Design, drawings and calculation Fire Hydrant system, Fire Alarm System, Gas detection System & Fire Extinguishers Completed
10 Technip India Limited.Essar Refinery Expansion,Gujarat. Preparation of Fire Protection system Design, drawings and calculation Review and Comment drawings and documents related to detail engineering Completed.
11 SBQ Steel Plant, 2x45MW Captive Power Plant, Gudur. Preparation of Fire Protection system Design, drawings and calculation Fire Hydrant system, Fire Alarm System, , HVWS System, MVWS System & Fire Extinguishers Completed.
12 Suryadev 80MW Coal based Power Plant, Gumidipoondi Preparation of Fire Protection system Design, drawings and calculation Fire Hydrant system, Fire Alarm System, , HVWS System, MVWS System, Fixed foam system & Fire Extinguishers Completed.
13 3500 TCD Sugar Factory, Cambodia. Preparation of Fire Protection system Design, drawings and calculation Fire Hydrant system, Fire Alarm System & Fire Extinguishers Completed
14 Proposed 50 MW Diesel Power Plant, Ndola, Zambia. Preparation of Fire Protection system Design, drawings and calculation Preparation of Fire Protection system Design, drawings and calculation Completed
15 Proposed Extension of Factory Bldg, DCW PVT.Ltd, Poonamalle, Chennai. Preparation of Fire Protection system Design, drawings Fire Hydrant system, Automatic Sprinkler System & Fire Extinguishers Completed
16 Kumar Organic Products, LTD., Bangalore. Fire Safety Audit, Electrical Audit, Fire safety Consultancy. Fire Safety Audit Report, Electrical audit report, Fire protection System Design. Completed
17 Al Hila Power Plant, Iraq. Preparation of Fire Protection system Design, drawings Fire Alarm System HVWS System, MVWS System. Completed
18 Bhilai Steel Plant, Chattisgarh. Designing of Fire Protection System for Gas Fired Boiler & Turbo Blower Building at Bhilai Steel Plant, Chattisgarh. Hydrant system, Water spray system, foam system, Inergen gas flooding system, Fire detection & alarm system. Work under Progress
19 BASF India Limited,Mangalore. Fire Safety Audit Fire Safety Audit Report Completed
20 Tagros Chemicals India Limited,Cuddalore. Preparation of Fire Protection system Design, drawings and calculation Fire Hydrant system, Fire Alarm System, MVWS System & Fire Extinguishers Completed
21 OPG Power Generation Pvt. Ltd at Gujarat Preparation of Fire Protection system Design, drawings and calculation Fire Hydrant system, Fire Alarm System, , HVWS System, MVWS System & Fire Extinguishers Completed
22 Sanvira Industries Ltd, Vizag. 2x8MW Cogeneration Power plant including Calcination Process Plant. Preparation of Fire Protection system Design, drawings and calculation Fire Hydrant system, Fire Alarm System, , HVWS System, MVWS System & Fire Extinguishers Completed.
23 APW President system ltd, Bangalore. Preparation of Fire Protection system Design, drawings and calculation Fire alarm system, Novec1230 fire suppression system & CO2 flooding system. Completed
24 APW President system ltd, Pune. Preparation of Fire Protection system Design, drawings and calculation Fire alarm system Completed.